Lift Servicing & Lift Installation

Lift Servicing & Lift Installation
  • Category

    Property Services

  • Contract Notice

    2017/S 034-060903

  • Award Notice

    2018/S 159-365009

  • CPV Code

    42416000: Lifts, skip hoists, hoists, escalators and moving walkways
    42416100: Lifts
    42416120: Goods lifts
    42419500: Parts of lift, skip hoists or escalators
    42419510: Parts of lifts
    44115600: Stairlifts
    45313000: Lift and escalator installation work
    45313100: Lift installation work

  • NUTS Code

    UK

  • Duration

    4 years

  • Expiry Date

    31st March 2022

  • Direct Selection

    Yes

  • Mini Competition

    Yes - 60% Quality / 40% Cost (10% +/- allowance)

  • Contract Type

    JCT, TPC or bespoke T&C's

  • Cost Model

    Schedule of rates

  • Access Fee

    Nil

  • Framework Appointees

Summary

NFP’s Lift Servicing and Lift Installation framework covers installation and refurbishment of lifts and lifting equipment to include but not exclusively to Hoists, though floor lifts and Arjo baths, to comply with the requirements of LOLER.

Next Steps

How to use this Framework?

Call offs may be awarded in any duration that is needed for their performance or where maintenance of equipment with an expected useful life of more than four years is required.

There are two ways to use the framework; direct selection or mini-competition.

Direct selection

With the direct selection method, you may select the Contractor who is ranked number 1, or any other Contractor/ Consultant on the following basis:

  • Where you have an existing relationship with the Contractor/ Consultant.
  • Where the Call Off has substantial similarities to a previous project the Contractor/ Consultant was involved with. (under this Framework Agreement or not)
  • For reasons of urgency, it is not reasonably practicable to award the Call-Off Contract by way of a Mini-Competition.
  • Capability Criteria determining that only one framework appointee is capable of carrying out the Call-Off Contract.
  • Where the Client is able to determine which Contractor/Consultant will provide it with the most economically advantageous offer.
  • Where the Consultant has introduced the site.

Mini competition

The mini-competition method lets you expand beyond the framework’s original specification to meet your specific requirements. The framework partners from the relevant lot are invited to tender (where capable). This process typically takes 2-4 weeks.

Next Steps

Call-off Forms (E-Sign)

NFP has simplified the call-off process to 5 steps allowing you access to our framework within minutes. The 5 steps include Adobe E-sign and details (or guidance) can be found below; alternatively, you can choose mini-competition.

To view these documents, please visit this page on a device with a wider screen.

Confidentiality Agreement

This form is designed to protect the commerciality of suppliers and the integrity of the framework. Clients will need to complete the fields prompted within the form, to allow password protected access for Steps 2, 3 -this will be supplied via email on completion. Once countersigned by NFP, a finalised pdf copy will be issued to your email address.

Mini Competition

To proceed with this framework using the Mini Competition method, please fill in the form. One of our team will be in contact with you as soon as possible.

Wish to discuss this Framework?

If you would like to discuss this Framework with one of our team, you can contact us to discuss your requirements on 0207 052 1531.

Alternatively, please fill in the form, and one of our team will get in touch as soon as possible.


Or, not got time now?

Use our brand new Microsoft Teams scheduler instead. Pick a convenient time and we will Teams call you.