Asbestos Inspection Framework

Asbestos Inspection Framework

Summary

This OJEU compliant Asbestos Inspections framework is designed to meet the client’s legal responsibilities under the Control of Asbestos Regulations 2012 through a specialist contractor, to assist in the management and control of asbestos.

The services include management, refurbishment and demolition asbestos surveys. 4-stage clearance testing and other asbestos management services in accordance with HSG 264.

All framework appointees have their own labs to ensure an efficient and robust service.

Next Steps

How can I use this Framework?

There are two ways to use the framework; direct selection or mini-competition. Clients may enter into contract for any duration that allows for performance to be achieved.

Direct selection

With the direct selection method, you may select the Contractor who is ranked number 1, or any other Contractor/ Consultant on the following basis:

  • Where you have an existing relationship with the Contractor/ Consultant.
  • Where the Call Off has substantial similarities to a previous project the Contractor/ Consultant was involved with. (under this Framework Agreement or not)
  • For reasons of urgency, it is not reasonably practicable to award the Call-Off Contract by way of a Mini-Competition.
  • Capability Criteria determining that only one framework appointee is capable of carrying out the Call-Off Contract.
  • Where the Client is able to determine which Contractor/Consultant will provide it with the most economically advantageous offer.
  • Where the Contractor/Consultant has introduced the site.

Mini competition

The mini-competition method lets you expand beyond the framework’s original specification to meet your specific requirements. The framework partners from the relevant lot are invited to tender (where capable). This process typically takes 2-4 weeks.

Call-off Forms (E-Sign)

NFP has simplified the call-off process to 5 steps allowing you access to our framework within minutes. The 5 steps include Adobe E-sign and details (or guidance) can be found below; alternatively, you can choose mini-competition.

To view these documents, please visit this page on a device with a wider screen.

Confidentiality Agreement

The form below is designed to protect the commerciality of suppliers and the integrity of the framework. Clients will need to complete the fields prompted within the form, to allow password protected access for Steps 2, 3.


Mini Competition

To proceed with this framework using the Mini Competition method, please fill in the form. One of our team will be in contact with you as soon as possible.