Welcome to National Framework Partnership
We empower public sector organisations to procure responsibly and efficiently.
With over 50 frameworks, we bring together an extensive network of 200 trusted, pre-qualified partners, to make procurement easy.
We deliver sustainable, economically advantageous procurement partnerships for a wide range of sectors; from charities and local authorities to housing associations and emergency services.
Working with us brings the peace of mind that comes with using one of the most trusted framework providers in the UK.
Our agreements are easy to use, fully compliant, and significantly reduce the time and resource it takes to find the supplier you need.
Using our service allows you to focus on what matters.
Who We Work With
Our frameworks are accessible to all 4896 UK registered Contracting Authorities and Public Bodies.
Housing
We support housing associations; in their essential work of providing homes to people who need them the most.
Blue Light
All emergency service providers can benefit from our frameworks to support their lifesaving work.
Education
We support schools, colleges and universities; to help providers focus on education.
Charities
Registered charities use our frameworks to support their social purpose.
Healthcare
We empower providers to focus on great care, supporting an array of healthcare-related needs.
Transport
We support essential government-regulated transport providers to help keep our nation moving.
Local Authorities
Councils can access our frameworks to support the diverse work they do to serve communities.
Government
Our frameworks support the vital functions of Government departments.
Why Choose Us?


National Coverage
Our Frameworks are all NUTS ‘UK’ compliant, therefore encompass the Public Sector throughout the United Kingdom.

4-Step Call-Off Process
Our unique 4-step direct selection process helps to keep procurement moving.

E-Sign. Intelligent procurement
Take advantage of NFP’s effortless E-signature tool to track contract approvals. This system provides documents in realtime. This way clients can call-off framework partners in minutes, instead of days or weeks.

Sustainable rates through trend data
NFP seeks sustainable relationships for its clients and therefore tracks and manages its cost matrices through market data. Ensuring compliance, service delivery, and sustainable profit margins.
Our Suppliers
NFP are proud to be in partnership with a vast array of providers across the UK. Encompassing every type of Public Body and partnering them with their most advantageous suppliers.
Our Clients
Our clients operate within many different sectors, from Local Authorities to Healthcare, Charities to Education. Take a look and see who we’ve worked with.
Public Sector Eligibility Checker *
To assist with your enquiry, we have introduced an online checker tool below to confirm your eligibility through the Office Of National Statistics.
* (Please be aware that certain contracting authorities such as Fire Brigades and NHS Trusts are not listed individually, instead listed En bloc. “Fire and Rescue Authorities (En Bloc) / NHS Trusts (England) (En Bloc) The latest ONS publication is July’19.
The Procurement Regulations 2024 (PR 24)
The Procurement Act 2023 came into effect on 24th February 2025. All procurement activities tendered before this date remain governed by the 2015 Public Contracts Regulations. Any call-off contracts from existing framework agreements established before 24th February 2025 will also continue under these regulations.
Existing framework agreements from NFP remain in place until their planned expiry dates. Upon expiry, they will be replaced under the new Act, and we will advise clients accordingly on which regulations apply.
Frequently asked questions
Who are National Framework Partnership (NFP)?
NFP is a managing agent for a contracting authority. We offer a comprehensive national procurement platform created to support public sector organisations in accessing compliant, streamlined frameworks for the procurement of goods, services, and works. Our mission is to simplify public procurement, reduce administrative burden, and ensure that all procurement activity remains legally compliant while delivering best value and transparency.
Who can use NFP?
Any UK-based public sector body, including local authorities, NHS trusts, housing associations, educational institutions, emergency services, and charitable organisations, can access and benefit from NFP’s frameworks. If your organisation falls under UK procurement legislation, you are eligible to use our platform.
The list below covers all current and future contracting authorities:.
-
Housing associations, including registered social landlords
-
Councils, including county councils, district councils, county borough councils, community councils, London borough councils, unitary councils, metropolitan councils, parish councils
-
Ministerial and non-ministerial government departments
-
Executive agencies of the government and other subsidiary bodies
-
Non-Departmental Public Bodies (NDPBs), including advisory NDPBs, executive NDPBs, and tribunal NDPBs
-
All non-Crown Status Government Companies wholly or partly owned by central government departments and their subsidiaries
-
Assembly Sponsored Public Bodies (ASPBs)
-
Police forces – this includes Police Forces and Special Police Forces in the UK, Police and Crime Commissioners, Police Authorities, and other relevant legislation for the constituent parts of the United Kingdom, for their respective rights and interests.Fire and rescue services
-
Ambulance services
-
Maritime and coastguard agency services
-
NHS bodies: NHS Authorities and Trusts, Clinical commissioning groups
-
Educational bodies or establishments including state schools (nursery schools, primary schools, middle or high schools, secondary schools, special schools), academies, colleges, Pupil Referral Unit (PRU), further education colleges and universities
-
Other Public Bodies and Public corporations and their subsidiary bodies sponsored by Central Government Departments that are not covered by named categories in this list
-
Public financial bodies or institutions
-
Public pension funds
-
Central banks
-
Civil service bodies, including public sector buying organisation
-
All new bodies created which fall within the criteria or as listed on nationalframeworkpartnership.co.uk
Are your frameworks legally safe to use?
Yes, all frameworks hosted by National Framework Partnership are fully compliant with the UK Public Contracts Regulations 2015 and or align with the requirements of the Procurement Act 2023. Each framework is tendered by a recognised Contracting Authority, ensuring legality and audit readiness.
Terminology: New vs Old Procurement Language
For those familiar with the Public Contract Regulations 2015, the Procurement Act 2024 introduces updated terminology.
Key equivalencies include:
New Term Previous Equivalent
Central Digital Platform Find a Tender Service (FTS)
Assessment Summary Standstill Letter
Procurement Specific Questionnaire (PSQ) Selection Questionnaire
Conditions of Participation Selection Criteria
Competitive Flexible Procedure (New Concept)
Conflicts Assessment (New Concept)
Open Framework (New Concept)
Dynamic Market Dynamic Purchasing System (DPS)
Pipeline Notice (New Concept)
Planned Procurement Notice Prior Information Notice (PIN)
Excludable Supplier Discretionary Exclusion Ground Applies
Excluded Supplier Mandatory Exclusion Ground Applies
Debarment List (New Concept)
Are you a Contracting Authority?
National Framework Partnership is a ‘Managing Agent’ for Hyde Housing Association, a registered charity, Mutual society number 18195R.
Hyde was established to provide social housing and associated services. Its charitable status reinforces the fact that its operations are not driven by purely commercial objectives but by the delivery of social value.
Under the Procurement Act 2023, several key factors are considered when determining whether an organisation is a contracting authority:
-
Public Funding
Hyde receives the majority of its funding from public sources, which satisfies the requirement that the organisation is supported predominantly by public funds. -
Public Authority Oversight
Hyde operates under oversight from public authorities, which exercise influence and control over its governance and decision-making. -
Commercial Basis
Hyde was established for the purpose of providing social housing and continues to deliver services with a strong social value objective. As such, it does not operate on a purely commercial basis.
-
What are the benefits of a framework?
A framework agreement allows for more flexibility around the goods or services contracted for under the framework, both in terms of volume and also the detail of the relevant goods and services.
A multi-supplier framework allows for a contracting authority to select from a number of suppliers for its requirements, helping to ensure that each purchase represents best value.
Permissible Users - Can we use the framework?
Any contracting Authority, as defined in Regulation 2 of the Public Contracts Regulations 2015, may utilise our frameworks.
Our contract notices include a link to the Office of National Statistics Classification Guide and/or the list below to cover all current and future contracting authorities, including.
- Ministerial and non-ministerial government departments
- Executive agencies of government and other subsidiary bodies
- Non-Departmental Public Bodies (NDPBs), including advisory NDPBs, executive NDPBs, and tribunal NDPBs
- All non-Crown Status Government Companies wholly or partly owned by central government departments and their subsidiaries
- Assembly Sponsored Public Bodies (ASPBs)
- Police forces – this includes Police Forces and Special Police Forces in the UK, Police and Crime Commissioners, Police Authorities, and other relevant legislation for the constituent parts of the United Kingdom, for their respective rights and interests.
- Fire and rescue services
- Ambulance services
- Maritime and coastguard agency services
- NHS bodies: NHS Authorities and Trusts, Clinical commissioning groups
- Educational bodies or establishments including state schools (nursery schools, primary schools, middle or high schools, secondary schools, special schools), academies, colleges, Pupil Referral Unit (PRU), further education colleges and universities
- Hospices
- National Parks
- Housing associations, including registered social landlords
- Third sector and charities
- Local Enterprise Partnerships
- Citizens advice bodies
- Councils, including county councils, district councils, county borough councils, community councils, London borough councils, unitary councils, metropolitan councils, parish councils
- Other Public Bodies and Public corporations and their subsidiary bodies sponsored by Central Government Departments which are not covered by named categories in this list
- Public financial bodies or institutions
- Public pension funds
- Central banks
- Civil service bodies, including public sector buying organisations
- All new bodies created which fall within the criteria
How do I get started?
Simply click on the required Framework on our website, and all the relevant documentation can be accessed within the framework page. With our new “E-Sign” package, accessing our frameworks is far less time consuming
What is the maximum duration of a call off?
Contracting Authorities may set any length of contract by taking account of factors such as the time needed for their performance, where maintenance of equipment with an expected useful life of more than four years is included, or where extensive training of staff to perform the contract is needed.
Call-off contracts can continue after the relevant framework agreement has expired.
Direct selection
An Authorised User may award a Call Off Contract directly to a Framework Contractor, without any further competition between the Framework Contractors, (“Direct Selection”) in any of the following circumstances:
- The Authorised User may award a Call Off Contract by Direct Selection to the number 1 ranked Framework Contractor on the Framework Lot in question. Should the number 1 ranked Framework Contractor not wish to accept the award of the Call Off Contract, Hyde or the Authorised User may award the Call Off Contract by Direct Selection to the number 2 ranked Framework Contractor on the Framework Lot in question, and so on;
- An Authorised User may award a Call Off Contract by Direct Selection to a Framework Contractor where the Framework Contractor has already carried out works or services at risk for the Trust or the Authorised User in relation to the site to which the Call Off Contract relates;
- The Authorised User may award a Call Off Contract by Direct Selection to a Framework Contractor where the Call Off Contract has substantial similarities to a previous project in which the Framework Contractor was involved (whether such project was the subject of a Call Off Contract awarded under this Framework Agreement or not);
- An Authorised User may award a Call Off Contract by Direct Selection to a Framework Contractor where for reasons of urgency it is not reasonably practicable to award the Call Off Contract by way of a Mini-Competition;
- An Authorised User may award a Call Off Contract by Direct Selection to a Framework Contractor where the Authorised User has determined through application of the Capability Criteria that only one Framework Contractor on the Framework Lot in question is capable of carrying out the Call Off Contract.
What is a Mini competition?
A mini competition is a process you need to carry out to place a call-off contract under a framework agreement where the best value supplier has not been specified. It allows you to further refine your requirement whilst retaining the benefits offered under the collaborative agreement.
PCR Directives
When awarding call-offs, the full procedural steps of the PCR Directives do not need to be applied.
Frameworks do not in themselves create any contractual obligations, whereas a call-off does. In placing a call-off contract with a supplier from a framework, your institution will be making a commitment to purchase the specified goods/services from that supplier.
How it works
1. We send out an ‘expression of interest’ to all providers on the framework, giving them the chance to opt in or out. Geographical location, value and/or current workload may mean not all those on the framework can accept a new contract.
2. Clients can then choose whether they want us to run the procurement process for them or carry it out in-house, with our support.
3. All our mini competitions are managed through Delta E-Sourcing and run on a price and quality basis.
4. During a tender period we manage all queries, ensuring a transparent process.
5. Returned submissions are made available to the client for evaluation and final selection.
6. Following selection of a provider, our Projects Officer will arrange and attend a kick start meeting.
Mini competition process
If an Authorised User wishes to award a Call Off Contract by way of a Mini-Competition, the Authorised User shall identify the Framework Contractors appointed who are capable of carrying out the particular Call Off Contract, and with the assistance of NFP shall invite those Framework Contractors to take part in a Mini-Competition.
Mini-Competition Process
1. Prepare your Invitation To Tender (ITT)
2. Issue your ITT
3. Evaluate responses and select supplier
4. Award1. Preparing your ITT
Although you cannot change the basic terms or specification set out in a framework agreement (the scope of the agreement cannot substantively change), mini-competitions do allow you to refine the basic terms of the framework prior to making a call-off. For example, areas you can refine include:Delivery timescales;
Invoicing/payment arrangements;
Associated services, such as installation, maintenance and training;
Quantity;
Functional specification.The invitation to take part in a Mini-Competition shall be issued in writing and will;
- explain whether the Mini-Competition is to comprise of written tender / selection proposals by the Framework Contractors, site visits, interviews or presentations or a combination of any of these things;
- where the Mini-Competition is to involve the submission of written tender proposals by the Framework Contractors, specify a fixed time limit for submission of such proposals, such time limit being of sufficient duration to allow proposals to be submitted, taking into account factors such as the complexity of the Works and Services in question, the nature of the Authorised User’s requirements and the time needed to compile and submit proposals;
- set out the evaluation criteria on which tenders submitted pursuant to the Mini-Competition will be assessed, which shall be based on the Mini-Competition Evaluation Criteria set out in Schedule 4 with such amendments as the Authorised User may stipulate to reflect the requirements of the Call Off Contract in question;
- contain a copy of the form of Call Off Contract that will be entered into with the successful Framework Contractor.
- When invited by an Authorised User to participate in a Mini-Competition, the Contractor shall provide written confirmation to the party carrying out the tender as to whether or not it wishes to participate.
- The Contractor shall be responsible for any costs it incurs in participating in a Mini-Competition and acknowledges and agrees that neither NFP, Hyde nor any Authorised User shall have any liability for such costs under any circumstances.
- The Mini-Competition will be assessed on the basis of the evaluation criteria set out in the invitation and all Framework Contractors invited to take part in the Mini-Competition will be informed of the outcome of that evaluation.
Do we need to issue a Contract award notice for a call-off?
There is no requirement* to publish an award notice for a call-off contract under a framework. However, if the value of the call-off is over the relevant threshold, you will need to include information about the award on the Contracts Finder website in accordance with Regulation 108.
*We recommend a VEAT notification letter to all the bidders to voluntarily hold a standstill period.
Call off contracts and liability
If the Contractor is selected to carry out a Call Off Contract (whether following a Mini-Competition or by Direct Selection), the Authorised User may issue a Call Off Contract to the Contractor for execution.
The Contractor shall execute and return the Call Off Contract to the Authorised User within ten (10) Working Days of receipt of the same or such longer period that the Authorised User may specify.
Should the Contractor fail to comply with its obligation in clause above, the Contractor shall be deemed to have declined the offer to enter into the Call Off Contract and Hyde or the Authorised User may recommence the selection process under this clause 5.
Once appointed to carry out Works and Services under a Call Off Contract, the Contractor shall carry out those Works and Services in accordance with the terms of the Call Off Contract.
Under Regulation 37 Contracting Authorities accessing these agreements are responsible for compliance with the PCR 2015 in respect of any parts of the procedure they conduct themselves, such as:
- Awarding a contract
- Conducting a mini competition.
- Determining which of the framework providers it should place an order or enter into a contract with.
It is therefore important that each client is aware of their responsibility, the limit of NFPs liability and the mechanism for how the award will work. NFP has set these out in 5 simple steps.
Mini competition criteria
Our frameworks allow for a 10% deviation to the relative priorities of the call-off award criteria from those used for framework award.
PCR Thresholds
The Public Contracts Regulations 2015 sets out a specific threshold for PCR tendering. These values are:
Contract Type (PCR 2015) Threshold from 1 January 2024 (inclusive of VAT) Public works contracts £5,372,609 Public supply contracts and public services contracts (Central Government) £139,688 Public supply contracts and public services contracts (all other contracting authorities) £214,904 Public service contracts for social and other specific services under the Light Touch Regime £663,540 (unchanged)
Who is responsible for a call off contract?
Under Regulation 37 Contracting Authorities accessing these agreements are responsible for compliance with the PCR 2015 in respect of any parts of the procedure they conduct themselves, such as:
Awarding a contract
Conducting a mini competition.
Determining which of the framework providers it should place an order or enter into a contract with.It is therefore important that each client is aware of their responsibility, the limit of NFPs liability and the mechanism for how the award will work. NFP has set these out in 5 simple steps.
Can we choose specific suppliers within a framework?
Yes, many frameworks allow clients to either directly award contracts to suppliers or to hold mini-competitions among suppliers within the framework to meet specific requirements.
Is there a contract period when using a framework provider?
Yes, framework agreements usually have a predetermined contract period which is specified in the framework documentation. You should review this documentation for details on the contract period and any potential extension options.
How does NFP handle data security and privacy?
NFP adheres to stringent data security and privacy regulations to protect client information. You should review the provider’s data protection policy for more information on how they handle data security and privacy.
Can we provide feedback on supplier performance?
Yes, clients are usually encouraged to provide feedback on supplier performance to help the framework provider maintain a high standard of service quality and to make informed decisions about supplier selection and retention.
What is a Framework Agreement?
A framework is a Public Contract Regulation (PCR) compliant agreement between one or more Contracting Authorities, listing several suitably qualified suppliers to provide Goods, Works, or Services to all Public Sector organisations.
There are four types of framework agreement, as stated in Regulation 33:
- Single supplier framework agreement. The contracting authority enters into contracts with the supplier in accordance with the terms of the framework, but can also ask the supplier to supplement its tender to reflect more refined requirements.
- Multi-supplier arrangements which set out all the terms under which contracts may be called off without further agreement. It must be clear from the procurement documents which supplier will perform the contract. Typically, this will be the supplier who achieved the highest score following evaluation to get onto the framework agreement or, if not available, and the documents permit it, the next highest-scorer.
- Multi-supplier arrangements do not set out all the terms of the arrangement and under which contracts will be awarded following mini competitions, the procedure for which must comply with regulation 33(11).
- Multi-supplier arrangements allow for contracts to be called off without opening competition and for mini-competitions. The decision as to which approach to use must be made on objective criteria set out in the initial procurement documents.
We generally operate Multi-supplier arrangements which allow for both contracts to be called off without opening competition, and for mini-competitions
Can I promote my company through your website
We actively encourage our framework suppliers to provide logo’s and testimonials as this enables prospective clients to readily see who our framework partners are. Please note that space is limited, and this will be fairly assessed on a case by case basis.
Framework fee
Generally speaking, Framework providers are funded via a levy/framework fee that is claimed from the framework appointee, for any called off contracts. The fee, claimed as a percentage of total invoice spend, is between 1-8%.
- Our fee is low at 1-2%
- We do not charge an annual fee
For our Architectural Services, Construction, and Employers Agent Frameworks we do not claim a percentage fee from the supplier. Instead, a nominal fee is invoiced to the client on a contract award.
SSIP - Safety Schemes in Procurement
The revised Construction (Design & Management) Regulations, which came into force in April 2007, introduced the Stage 1 Core Criteria for assessing health and safety competence of contractors and consultants working in
the construction industry. The introduction of these competence criteria provided an opportunity for existing
health and safety prequalification schemes to build on and formalise mutual recognition already in operation
amongst some schemes.
SSIP assessments are all judged on core criteria approved by HSE.How can we become an approved supplier?
To become an approved supplier, you need to participate in the framework tender process which is advertised publicly. You will need to satisfy the criteria mentioned in the tender documentation, which usually includes demonstrating financial stability, relevant experience, and adherence to quality standards.
You can check current opportunities on our tenders page:
What are the benefits of being on a public sector framework?
Being on a public sector framework often results in a more streamlined procurement process, increased business opportunities with various public sector entities, and the potential for long-term partnerships and contracts.
Are there any specific certifications or standards we need to adhere to?
Yes, depending on the nature of the goods or services being supplied, you may need to adhere to specific certifications or standards which will be outlined in the framework agreement documentation. This may include quality management standards, environmental certifications, and industry-specific accreditations.
How are contracts awarded under a framework agreement?
Contracts under a framework agreement are usually awarded through a mini-competition or a direct award process among the suppliers who are on the framework. The exact process will be defined in the framework agreement documentation.
Can we negotiate the terms of the framework agreement once we are selected?
The terms of the framework agreement are generally fixed and non-negotiable once the agreement is in place. However, there may be room for non-material negotiations during the tender process before a call-off is finalised
What is the duration of a framework agreement?
The duration of a framework agreement can vary but is usually between 2 to 4 years, potentially with options to extend for further periods as stipulated in the agreement.
How is pricing determined under a framework agreement?
Pricing under a framework agreement is usually determined during the tender process and is based on the supplier’s proposed pricing structure, which may include volume-based discounts or other pricing strategies.
What is expected in terms of quality assurance and reporting?
Suppliers are generally expected to adhere to pre-agreed quality standards and may be required to submit regular reports demonstrating compliance with these standards. This may include performance metrics, service level agreements (SLAs), and quality audits.
Who should we contact if we have any issues or concerns during the contract period?
If you have any issues or concerns during the contract period, you should contact the designated contract manager or procurement officer from the public sector entity, as mentioned in the framework agreement.
Is it possible to join a framework agreement midway?
Typically, joining a framework agreement midway is not possible as suppliers are selected through a tender process that occurs at the outset. However, our DPS allows for the addition of new suppliers at specified intervals or under certain conditions.
How can we ensure compliance with environmental and social value considerations?
To ensure compliance with environmental and social value considerations, you need to adhere to the standards and guidelines specified in the framework agreement. This might include demonstrating sustainable business practices, offering community benefits, or other criteria outlined in the agreement.
What happens if we fail to meet the performance standards outlined in the framework agreement?
Failure to meet the performance standards outlined in the framework agreement can have various consequences, including financial penalties, loss of business, or even removal from the framework agreement. It’s crucial to continuously monitor performance and make necessary adjustments to meet the required standards.
Can we subcontract work under the framework agreement?
Subcontracting may be allowed under the framework agreement, but usually requires prior approval from the public sector entity. It is essential to ensure that any subcontractors also adhere to the terms and conditions outlined in the framework agreement.
How can we update our pricing or service offerings during the contract period?
Generally, the pricing and service offerings are fixed for the duration of the framework agreement. However, there might be provisions for reviews and adjustments at specified intervals or under certain conditions, I.e CPI. Any changes would typically need to be negotiated and agreed upon with the public sector entity.
How is the performance of suppliers evaluated?
The performance of suppliers is typically evaluated based on a variety of metrics outlined in the framework agreement. This might include adherence to service levels, quality of goods or services provided, compliance with environmental and social value criteria, and customer satisfaction.
What are the payment terms under the framework agreement?
Payment terms under the framework agreement will be defined in the contract documentation. Usually 37 days for the fee. Usually, payment terms align with standard public sector payment policies, which might stipulate payment within a certain number of days following invoice receipt.
How can we resolve disputes arising during the contract period?
Disputes arising during the contract period should ideally be resolved through the mechanisms outlined in the framework agreement. This might include discussions with the designated contract manager, or formal dispute resolution processes if necessary.
How are framework agreements different from standalone contracts?
Framework agreements differ from standalone contracts in that they establish a long-term relationship between the supplier and the public sector entity, streamlining the procurement process for recurrent goods or services. They allow for quicker and more efficient procurement compared to negotiating separate contracts for each procurement.
Can smaller suppliers join the framework?
Yes, many frameworks encourage participation from smaller suppliers to promote competition and innovation. The criteria for joining would be outlined in the specific framework documentation.
How are suppliers evaluated in the framework?
Suppliers are usually evaluated based on various criteria including their financial stability, experience, technical competence, and ability to deliver quality services or products at competitive prices.